Execution of a Tensioned Structure to cover the grandstand at the Aveiro Sports Football Association Stadium.
The support structure is made of reconstituted welded profile P.R.S. with variable geometry, with a anticlastic surface coverage and open surroundings, with 230 m2.
The project is currently in fabrication. We await its completion and assembly to share the final result.